Future projects
Green Hydrogen Plant
Planned green hydrogen production in 3 phases
Each phase consisting of 5 MW of installed hydrogen electrolysers
The electricity used for electrolysers will be 100% renewable, sourced from the in-house biomass to electricity plant
![](https://assets.zyrosite.com/cdn-cgi/image/format=auto,w=606,h=384,fit=crop/AR0lvJrj6LH3yjx6/h2-dOqX5yaMp2sBg28O.jpg)
![](https://assets.zyrosite.com/cdn-cgi/image/format=auto,w=382,h=304,fit=crop/AR0lvJrj6LH3yjx6/h2-dOqX5yaMp2sBg28O.jpg)
Biomass Cogeneration Plant
25 MW bagasse based electricity generation plant
![](https://assets.zyrosite.com/cdn-cgi/image/format=auto,w=606,h=384,fit=crop/AR0lvJrj6LH3yjx6/energy-4030427_1280-YZ9nwjORxPukb7ZW.jpg)
![](https://assets.zyrosite.com/cdn-cgi/image/format=auto,w=382,h=304,fit=crop/AR0lvJrj6LH3yjx6/energy-4030427_1280-YZ9nwjORxPukb7ZW.jpg)
Manufacturing Unit Capacity Expansion
Cane Crushing Capacity to be increased from 5000 TCD to 9000 TCD
Ethanol production capacity to be increased from 75KLPD to 300KLPD
Bio-compost production to be increased from 200TPD to 360TPD